Location: Seattle, WA
General Contractor: Foushee Construction
Suite 3500 at 4th & Madison was the remodel in an existing space on 35 of an existing high-rise building. This projected consisted of the design & turn-key installations of the electrical systems, fire alarm system and the rough-in of low-voltage systems.
Scope of work included:
- Complete design-build electrical system
- Life safety Systems
- Low-voltage systems rough-in
Photos courtesy of Foushee Construction