Location: Yelm, WA
General Contractor: Colvos Construction
Stor-House Yelm consisted of the new construction of a 3-story self-storage facility. This projected consisted of the turn-key installations of the electrical systems, fire alarm systems, 2-way communications system, elevator connections and connections for a duplex sewer grinder pump.
Scope of work included:
- Complete design-build electrical system
- Life safety Systems
- Elevator Connections
- Sewer Grinder Pump Connections
Photos courtesy of Colvos Construction