Location: Seattle, WA
General Contractor: Colvos Construction
SecureSpace Corgiat consisted of the new construction of a 4-story self-storage facility. This projected consisted of the turn-key installations of the electrical systems, fire alarm systems, 2-way communications system, elevator connections, SCL Primary Utility infrastructure and connections to EV Chargers.
Scope of work included:
- Complete design-build electrical system
- SCL Primary Utilities
- Life safety Systems
- EV Charging connections
- Elevator Connections