The Astor Apts – Washington Building

The Astor Apts – Washington Building

Location: Tacoma, WA

General Contractor: Venture Contracting

The Astor Apts included the rehab and repurpose of an existing historic high-rise building in downtown Tacoma into multi-family apartments. This project consisted of the turn-key installations of the design-build electrical systems, design-build fire alarm and life safety systems, design-build CCTV system, and design-build entry intercom/access system.

Scope of work included:

  • Complete design-build electrical system
  • Design-build fire alarm & life safety systems
  • VE efforts to bring cost down to owners budget
  • Design-build entry intercom/access systems
  • Design-build CCTV system
04 Nov 2026
Merrill Gardens – Wright Park

Merrill Gardens – Wright Park

Location: Tacoma, WA

General Contractor: Rush Construction

Merrill Gardens was the ground-up construction of a new assisted living retirement home. This projected consisted of the turn-key installations of the design-build electrical systems, fire alarm system, primary utilities, and design-build of low-voltage systems.

Scope of work included:

  • Complete design-build electrical system
  • TPU primary power
  • Design-build Life safety Systems
  • Distributed Antenna System (DAS)
  • Complete phone/data wiring & terminations
  • Speaker/PA system
  • Intercom system
  • A/V Theater wiring & connections
  • Electric Fire Pump connections
  • CCTV System
  • Security System
  • EV Charging
  • Nurse Call system
14 Sep 2026
The Terrapin Apartments

The Terrapin Apartments

Location: Bellevue, WA

General Contractor: WG Clark Construction

The Terrapin Apartments was the ground-up construction of a new mid-rise apartment building that included 172 market-ready apartment units. This projected consisted of design & turn-key installations of the electrical systems, Phone/CATV systems, fire alarm systems, access control systems, CCTV systems, Solar PV array system, Car Stacker connections and Public Safety DAS systems.

Scope of work included:

  • Complete design-build electrical system
  • Phone/CATV Systems
  • Life safety systems
  • Entry Access Systems
  • CCTV Systems
  • Car Stacker Connections
  • Elevator Connections

Photos courtesy of WG Clark Construction

14 Sep 2026
Station House Apartments

Station House Apartments

Location: Redmond, WA

General Contractor: WG Clark Construction

Station House Apartments was a ground-up construction of a new mid-rise apartment building that included 196 market-ready apartment units. This projected consisted of design & turn-key installations of the electrical systems, Phone/CATV systems, fire alarm systems, access control systems, and CCTV systems.

Scope of work included:

  • Complete design-build electrical system
  • Phone/CATV Systems
  • Life safety systems
  • Entry Access Systems
  • CCTV Systems
  • Elevator connections
  • Street Lighting
14 Sep 2026
Pacific Ave Apartments

Pacific Ave Apartments

Location: Seattle, WA

General Contractor: RAFN Construction

Pacific Ave Apartments was a rehab/renovation of an existing historic mid-rise apartment building that included 137 affordable-housing apartment units. This projected consisted of reworking existing utilities to accommodate updated use of the building along with turn-key installations of the electrical systems, Phone/CATV systems and design-build fire alarm systems.

Scope of work included:

  • Electrical system
  • Design-Build Phone/CATV Systems
  • Design-Build Life safety systems
  • SCL Utility re-work/re-routing
14 Sep 2026
Jackson St Apartments

Jackson St Apartments

Location: Seattle, WA

General Contractor: WG Clark Construction

Jackson St. Apartments was a ground-up construction of a new mid-rise apartment building that included 75 market-ready apartment units. This projected consisted of design & turn-key installations of the electrical systems, Phone/CATV systems, fire alarm systems, access control systems, and CCTV systems.

Scope of work included:

  • Complete design-build electrical system
  • Phone/CATV Systems
  • Life safety systems
  • Entry Access Systems
  • CCTV Systems
  • SCL Vault Build-out
  • Elevator connections
14 Sep 2026
Ethiopian Village Exterior

Ethiopian Village

Location: Seattle, WA

General Contractor: Walsh Construction

Ethiopian Village was a ground-up construction of a new mid-rise apartment building that included 90 affordable housing units for seniors along with the renovation of an existing 1-story community center. This projected consisted of design & turn-key installations of the electrical systems, fire alarm systems, access control systems, Phone/CATV systems, CCTV systems, Solar PV array system and Public Safety DAS systems.

Scope of work included:

  • Complete design-build electrical system
  • Phone/CATV Systems
  • Life safety Systems
  • Entry Access Systems
  • CCTV Systems
  • Solar PV Array Systems
  • EV Charging
  • Elevator Connections

Photos courtesy of Walsh Construction

17 Aug 2026
The Hemlock exterior

The Hemlock Apartments

Location: Lynnwood, WA

General Contractor: WG Clark Construction

The Hemlock Apartments was a ground-up construction of a new mid-rise apartment building that included 3 separate towers on top of a single parking garage that housed 297 market-ready apartment units. This projected consisted of design & turn-key installations of the electrical systems, Phone/CATV systems, fire alarm systems, access control systems, EV Charging systems, solar PV array systems and CCTV systems.

Scope of work included:

  • Complete design-build electrical system
  • Phone/CATV Systems
  • Life safety systems
  • Entry Access Systems
  • CCTV Systems
  • EV Charging
  • Solar PV Array
  • SCL Vault Build-out
  • Elevator connections
10 Aug 2026
Broadcast Apartments Exterior

Broadcast Apartments

Location: Seattle, WA

General Contractor: WG Clark Construction

Broadcast Apartments was a ground-up construction of a new mid-rise apartment building that included 70 market-ready apartment units and 4 live-work units. This projected consisted of design & turn-key installations of the electrical systems, Phone/CATV systems, fire alarm systems, access control systems and CCTV systems.

Scope of work included:

  • Complete design-build electrical system
  • Phone/CATV Systems
  • Life safety systems
  • Entry Access Systems
  • CCTV Systems
  • Elevator Connections
06 Aug 2026
900 Rainier

900 Rainier Apartments

Location: Seattle, WA

General Contractor: Venture Contracting

900 Rainier Apartments was a ground-up construction of a new mid-rise apartment building that included 292 market-ready apartment units. This projected consisted of design & turn-key installations of the electrical systems, Phone/CATV systems, fire alarm systems, access control systems, CCTV systems, Solar PV array system and Public Safety DAS systems.

Scope of work included:

  • Complete design-build electrical system
  • Phone/CATV Systems
  • Life safety systems
  • Entry Access Systems
  • CCTV Systems
  • EV Charging
  • Elevator Connections

Photos courtesy of Venture Contracting